QUARTERLY UPDATE HIGHLIGHTS
4.38 Release Highlights
Bulk Edit Batches and Planned Orders
Mass Component Maintenance
Minimum Order Quantity in MRP
Material Substitutions Icon
Remove Items from Proposed Cost
Saved Detailed Component Cost Rollup Results
Bulk Edit Batches and Planned Orders
This feature was prompted by customer feedback and gives the user the ability to perform bulk edits.
———————————————————–
Mass Component Maintenance
The Mass Component Maintenance window has been enhanced to allow the ability to select and delete multiple formulas from the range utilizing the “Remove checkbox” column to select the records to be removed. Additionally, column filters have been added to assist in identifying records to be removed.
Previously, formulas had to be selected and removed from the grid on an individual basis.
———————————————————–
Minimum Order Quantity in MRP
MRP now supports using the minimum order of purchased items on Planned Orders.
———————————————————–
Material Substitutions Icons
Batch Procedure and BOM grids have been enhanced with the addition of an icon to visually indicate that the row item has available substitutions.
———————————————————–
Remove Items from Proposed Cost
This feature added support for selecting and removing one or more rows from a proposed cost list by clicking on the left column row indicator in conjunction with the <Shift> or <Ctrl> and <Del> keys.
———————————————————–
Saved Detailed Component Cost Rollup Results
The detailed results of a Component Cost Rollup (CCR) can now be optionally saved to a SQL table for future reporting. This function is available through the Component Cost Rollup screen or from the VicinityView tool.
The saved CCR can be reprinted through VicinityView >> Reports >> Product Development >> Saved Component Cost Rollup.
———————————————————–
If you are not a customer of Vicinity Software, contact us today for a demo and to learn more about how we can support your business.
Contact Us Today!